
Offeringfor business
Hotels, restaurants, offices, retail. Interiors that build the brand and work operationally.
When do you call us?
Opening looms, every week costs
Rent runs, crews ready. You need a studio that holds deadlines. 8 days late = a month of lost revenue.
Guests judge the interior in 5 seconds
The interior tells the brand's story. Fabric and light decide whether a guest photos it and returns.
You have an architect, you need an interior designer
Architecture ready. The interior needs a softer layer: fabric, palette, styling.
Refresh without closing the business
The hotel runs, the restaurant serves. Refresh overnight or in blocks. 0 closure days.

What you actually get
Of projects on schedule
With a 5-10% buffer. Weekly report, on-site twice a month.
Point of contact
One PM, one contract, one invoice. No five subcontractors to chase.
Martindale cycles
Every F&B / hospitality fabric tested: abrasion, stain resistance, fire class B1.
3D visualisations
Risk-free decision. Partners and investors see the interior before signing.
Warranty
Stitching and installation - lifetime liability. Fabrics warranted per manufacturer (Designers Guild, Romo, Sahco).
Of closure during refresh
Night or after-hours work. Hotel, restaurant, office keep running.
Who we work with
Hotels and guesthouses
Rooms, lobbies, shared spaces.
Restaurants and cafés
Dining room, acoustics, lighting, materials.
Offices and showrooms
Interiors that represent the brand.
Stores and boutiques
Backdrops that elevate the product.
How a project runs
- 01
1wk
Business brief
Brand goals, persona, budget, timeline, KPIs.
You receive
Brief PDF (8-12 pages), scope signed off.
- 02
1-2wk
Space audit
Site visit, flow analysis, acoustics, lighting, infrastructure.
You receive
Audit report: photos, measurements, as-built plan, risk list.
- 03
3-4wk
Concept + 3D
Design, palette, materials, lighting. Live presentation.
You receive
Moodboard, 5-10 3D visualisations, material schedule.
- 04
2-3wk
Documentation
Execution drawings, budget, contractor list.
You receive
DWG/PDF files, budget, list of 3-5 contractors per scope.
- 05
8-20wk
Build and supervision
Crew coordination, quality control, in-flight changes.
You receive
Weekly reports, site photos, change log, acceptance protocols.
- 06
1wk
Opening
Final styling, technical rehearsals, soft opening.
You receive
As-built docs, fabric care manual, warranty.
Projects for:
- Hotel Lumen
- Lawenda Restaurant
- Café Praga
- Gdańsk Showroom
- Bistro Mokotów
- Hotel Tatry

Jolanta Szcześniak
Founder and lead designer, Studio Styl
Let's talk about your project.

Jolanta Szcześniak
Founder and lead designer, Studio Styl
During the call you'll learn, among others:
- Approximate quote for design and textiles
- Concrete delivery schedule
- Right type of curtains, blinds or sheers for your window
- List of steps to take before window-treatment installation