Elegant hotel restaurant interior with marble floor and caramel chairs

Offeringfor business

Hotels, restaurants, offices, retail. Interiors that build the brand and work operationally.

When do you call us?

01

Opening looms, every week costs

Rent runs, crews ready. You need a studio that holds deadlines. 8 days late = a month of lost revenue.

02

Guests judge the interior in 5 seconds

The interior tells the brand's story. Fabric and light decide whether a guest photos it and returns.

03

You have an architect, you need an interior designer

Architecture ready. The interior needs a softer layer: fabric, palette, styling.

04

Refresh without closing the business

The hotel runs, the restaurant serves. Refresh overnight or in blocks. 0 closure days.

What you actually get

95%

Of projects on schedule

With a 5-10% buffer. Weekly report, on-site twice a month.

1

Point of contact

One PM, one contract, one invoice. No five subcontractors to chase.

30 000+

Martindale cycles

Every F&B / hospitality fabric tested: abrasion, stain resistance, fire class B1.

5-10

3D visualisations

Risk-free decision. Partners and investors see the interior before signing.

lifetime

Warranty

Stitching and installation - lifetime liability. Fabrics warranted per manufacturer (Designers Guild, Romo, Sahco).

0 days

Of closure during refresh

Night or after-hours work. Hotel, restaurant, office keep running.

Who we work with

Hotels and guesthouses

Rooms, lobbies, shared spaces.

Restaurants and cafés

Dining room, acoustics, lighting, materials.

Offices and showrooms

Interiors that represent the brand.

Stores and boutiques

Backdrops that elevate the product.

How a project runs

  1. 01

    1wk

    Business brief

    Brand goals, persona, budget, timeline, KPIs.

    You receive

    Brief PDF (8-12 pages), scope signed off.

  2. 02

    1-2wk

    Space audit

    Site visit, flow analysis, acoustics, lighting, infrastructure.

    You receive

    Audit report: photos, measurements, as-built plan, risk list.

  3. 03

    3-4wk

    Concept + 3D

    Design, palette, materials, lighting. Live presentation.

    You receive

    Moodboard, 5-10 3D visualisations, material schedule.

  4. 04

    2-3wk

    Documentation

    Execution drawings, budget, contractor list.

    You receive

    DWG/PDF files, budget, list of 3-5 contractors per scope.

  5. 05

    8-20wk

    Build and supervision

    Crew coordination, quality control, in-flight changes.

    You receive

    Weekly reports, site photos, change log, acceptance protocols.

  6. 06

    1wk

    Opening

    Final styling, technical rehearsals, soft opening.

    You receive

    As-built docs, fabric care manual, warranty.

"We opened a boutique hotel in three months. Studio Styl took full responsibility for the interior - design, crews, final styling. We opened on schedule, and guests talk about the rooms more than breakfast."

Marek Wiśniewski

Founder, Hotel Lumen · Boutique hotel · Sopot, 2025

Projects for:

  • Hotel Lumen
  • Lawenda Restaurant
  • Café Praga
  • Gdańsk Showroom
  • Bistro Mokotów
  • Hotel Tatry

Let's talk about your project.

Jolanta Szcześniak

Jolanta Szcześniak

Founder and lead designer, Studio Styl

During the call you'll learn, among others:

  • Approximate quote for design and textiles
  • Concrete delivery schedule
  • Right type of curtains, blinds or sheers for your window
  • List of steps to take before window-treatment installation